高清无码a级片_亚洲性爱Av_精品一级无码AV_97久久久免费_国产最新AV_日韩欧美亚洲人妻

高清无码a级片_亚洲性爱Av_精品一级无码AV_97久久久免费_国产最新AV_日韩欧美亚洲人妻

高清无码a级片_亚洲性爱Av_精品一级无码AV_97久久久免费_国产最新AV_日韩欧美亚洲人妻

The Pioneer in Under Vehicle Scanning System National Industry Standard Drafting Unit
CN EN
National Service Hotline Service Hotline400-661-6686
15628996088
Keywords:

font: BigMiddleSmall

Date: Feb 16,2022
[Article guide]

9Backfilling: Use concrete to fill the gaps between the steel grooves of the vehicle bottom scanner and the pit body, as well as between the pipes and the cable troughs. When backfilling concrete, avoid applying excessive force to prevent the steel trough from moving, which may cause the steel trough of the vehicle bottom scanner to shift. The protruding part of the steel groove of the vehicle underbody scanner and the road surface should be plastered with concrete to form a slow slope. The upper part is made into a smooth surface.10Maintenance work: Do a good job in concrete maintenance to ensure72No vehicles are allowed to pass above within hours. If construction......

9Backfilling: Use concrete to fill the gaps between the steel grooves of the vehicle bottom scanner and the pit body, as well as between the pipes and the cable troughs. When backfilling concrete, avoid applying excessive force to prevent the steel trough from moving, which may cause the steel trough of the vehicle bottom scanner to shift. The protruding part of the steel groove of the vehicle underbody scanner and the road surface should be plastered with concrete to form a slow slope. The upper part is made into a smooth surface.

Underbody scanning equipment

10Maintenance work: Do a good job in concrete maintenance to ensure72No vehicles are allowed to pass above within hours. If vehicles need to pass through during the construction process, steel plates should be used for covering. The initial setting and final setting of cement are affected by temperature. The lower the temperature, the longer the setting time required. Therefore, when constructing in low-temperature conditions, measures should be taken to keep warm to ensure the quality of the concrete. In hot weather, the newly set cement should not be exposed to too much sunlight. A sack or absorbent material should be laid on it and water should be scattered on it.

11For the distribution cabinet of the fixed vehicle bottom security inspection system: Build a cement structure with a length of at the position of the fixed distribution cabinet80cmThe width is60cmThe height is10cmThe concrete island is waiting to be found72After the cement has solidified, place the distribution cabinet on the cement island and fix it with expansion screws. Concrete has a few days to set. During the construction process, when vehicles pass by, the concrete may need to be covered with steel plates during its curing period.

Shandong Seenboom isUndercarriage security checkandUnderbody scanning systemAs a manufacturer, we can provide it for you Security check items at the crossing"Solutions and customized services!"

Underbody scanning equipment

Recommended News

Data Updating
高清无码a级片_亚洲性爱Av_精品一级无码AV_97久久久免费_国产最新AV_日韩欧美亚洲人妻
日韩无码一级黄色片| 大香蕉免费在线| 操操射网| 超碰91AV官网在线| 婷婷五月天AV| 欧美成人a猛片在线观看| 在线日韩AV电影| aa片网| A片无码网站| 日韩国产三级91| 超碰资源亚洲免费| 麻豆九九九九| 国产精选AV| 日韩颜射| 在线观看高清av| 欧美日一道本在线观看| 熟女福利导航在线| 黄成人网| 国产任我操| 日本无码影片| 草草爱人人| 成人a片网站导航| 一级片911免费视频| 精品人妻少妇嫐草视频| 成人午夜视频777| 免费看的黄色网址| 在线看a网址| 成人黄色AV电影| 亚洲AV首页| 成人无码区免费AⅤ片| 找av导航| 黄色毛a片| 日韩性爱毛片| 黄色AV电影在线| 日韩色色色网| 在线一级A片| 无码AV日韩一道| 黑人Av在线看| 91超碰中文字幕| 久久久久久三级黄色A片| 伊拉克黄色一级A片|